通风各工种操作规程由刀豆文库小编整理,希望给你工作、学习、生活带来方便,猜你可能喜欢“通风段各工种操作规程”。
目
录
监测工岗位责任制 ················································································· 1 便携仪发放岗位责任制 ········································································· 1 导通人员操作规程 ················································································· 1 火工品搬运操作规程 ············································································· 1 火药库管理员操作规程 ········································································· 2 放炮员操作规程 ····················································································· 2 掘进放炮操作规程 ················································································· 4 采煤工作面放炮员操作规程 ································································ 10 防尘工操作规程 ··················································································· 14 防火工操作规程 ··················································································· 15 测风员操作规则 ··················································································· 15 木工操作规程 ······················································································· 16 注水工操作规程 ··················································································· 17 测尘工操作规程 ··················································································· 17 微机工操作规程 ··················································································· 18 拆除安装工操作规程 ··········································································· 19 盲巷管理工操作规程 ··········································································· 19 瓦检工操作规程 ··················································································· 19 光学甲烷测定仪校验操作规程 ···························································· 20 监测工操作规程 ··················································································· 20 便携仪校验操作规程 ··········································································· 21 木工操作规程 ······················································································· 21 打钻工操作规程 ··················································································· 22 防尘工操作规程 ··················································································· 23 防火工操作规程 ··················································································· 23 井下瓦斯抽放泵工操作规程 ································································ 24
监测工岗位责任制
1、熟练掌握弱电及监测系统的有关知识,精通维修技术。
2、按要求检查检修监测装置,吊挂监测线子。
3、每周校验监测分站及瓦斯传感器。
便携仪发放岗位责任制
1、掌握仪器性能及充电方法。
2、按牌对号发放,不合格的不得入井。
3、仪器回收是要检查仪器是否完好,并及时上架充电。
4、发现仪器损坏,及时向有关人员汇报。
5、经常和维修人员取得联系,发现问题及时解决。
导通人员操作规程
1、雷管进库后,必须由导通人员验查,雷管包装是否完好,是否缺段,确认无误后,方可进行导通。
2、雷管的导通必须在专用导通室内进行,必须由导通人员亲自打开雷管盖,其他人员不得随便打开雷管箱盖。
3、由导通人员用雷管测试仪逐一检查不同断号雷管电阻的大小,必须符合(3.5—6.3欧姆),查出不合格的雷管必须跟当班库管员讲明不合格雷管的品种数量及出厂日期,然后由库管员填入报废雷管登记薄。
火工品搬运操作规程
1、炸药雷管到矿后,由下药人员根据移拨单验查炸药雷管的品种数量及包装是否完好,确认无误后,方可装卸。
2、装卸时要轻装轻放,严禁撞击,装卸后由下药人员跟运输区联系,及时地把炸药雷管打下井,由下药人员安全地把炸药雷管运送到井下药库。
3、炸药雷管到库后,必须整齐的把炸药雷管放进各自壁槽内,并向当班库管员讲明下药的品种、数量,由库管员验收入帐。
火药库管理员操作规程
1、炸药雷管到库后,库管员必须验收登记炸药雷管的品种数量,包装是否完好,雷管是否缺段,确认无误后,方可进入各自的壁槽内。
2、炸药雷管进库后,库管员必须按照先进发,后进后发,防止积压。
3、库管员必须把导通合格的雷管进行编号,编号要在专用编号室内进行,必须专人专号,坚持“七项制度”、“五不发”的原则,根据当班计划进行对号发放。
4、库管员回收退库雷管时,必须验查,做到帐卡相符。
放炮员操作规程
一般规定:
1、井下放炮工作必须由有两年以上的工龄的专职放炮员担任,并经过专门培训、考试合格,方可持证上岗。
2、放炮员必须熟悉爆破器材的性能和《煤矿安全规程》中有关条文的规定。
3、接触爆破材料的人员应该穿棉布或其它抗静电衣服,不准穿带静电的化纤衣服。
4、放炮员下井前要领取符合规定的瓦斯报警仪、放炮器和放炮母线等。不符合规定的放炮器不准下井使用;放炮员必须严格执行集团公司、矿制定的爆破器材领用退的管理制度。
5、使用爆破器材的规定
(1)禁止使用冻结或半冻结的硝化甘油炸药,并禁止将其折断、切割、揉搓、扎眼或撕下药包纸。
(2)不得使用含水超过0.5%的铵梯炸药。(3)井下严禁使用黑火药。
6、在有瓦斯或煤尘爆炸危险的煤层中掘进时,必须使用取得产品许可证的煤矿许用炸药和煤矿许用瞬发及毫秒延期电雷管。延期电雷管第一段与瞬发电雷管不得互相代替使用。不同厂家生产的和不同型号的电雷管不得混杂使用。
7、在发出使用电雷管前,必须逐个做全电阻和导通检查,严禁发放不通电和电阻不合格的电雷管。
8、用放炮方法贯通巷道时,必须严格遵守作业规程有关的规定。
9、在开凿或延深立井井筒,爆破材料运送到井底工作面和在井筒内装药时,除负责装药、放炮人员和水泵司机外、其他人员都必须撤到地面或生产水平。
10、严禁采用糊炮或明火放炮;严禁用炮崩落卡在溜煤眼中煤矸,如确需崩眼必须编制措施,报矿总工程师批准。
11、在高瓦斯或煤(岩)与瓦斯突出的掘进工作面放炮,必须严格执行制定的特殊安全措施。
掘进放炮操作规程
一、炮前准备工作
1、爆破材料的运送与存放
(1)电雷管必须由放炮员亲自运送,炸药可由放炮员或在放炮员监护下,由经过培训的放炮员助手运送。
(2)领取的电雷管和炸药应分别装在不同的坚实的非金属容器内。严禁将爆破材料装在衣袋内。领到爆破材料后须直接送到工作地点,严禁中途逗留。
爆破材料运送到工作地点后,炸药、雷管仍应分别存放在木制后其他绝缘材料制成的专业炮药箱内。
炮药箱应放到警戒线以外支护完好的、干燥的安全地点,并离开电气设备和电缆、电线。
炮药箱要加锁,钥匙由放炮员随身携带。
(3)严禁用刮板输送机或胶带输送机运送爆破材料。
(4)放炮前需准备好足够使用的引药、炮泥和水炮泥,并整齐放置在符合规定的地点。
2、检查放炮器与放炮母线。放炮器要完好可靠,电压符合要求;放炮母线长度符合规定,并无断头和短路,绝缘皮有破损处应及时处理。
3、准备好炮辊、岩(煤)粉掏勺等放炮器具。
4、引药的装配
(1)装配引药必须在顶板完好、支架完整,避开电气设备和导电体的放炮地点附近进行,严禁坐在炮药箱上装配引药。(2)从成束的电雷管中抽取单个电雷管时,不得手拉脚线硬拽管体,也不得手拉管体硬拽脚线;应将成束的电雷管脚线顺好,拉住前端脚线将管体抽出。抽出后的单个电雷管的脚线末端要扭结。
(3)装配引药时,必须防止电雷管受震动或冲击以及折断电雷管脚线和损坏脚线绝缘层。
(4)电雷管只许由药卷的顶部装入。先用木或竹制的炮针在药卷顶端中心扎略大于雷管直的孔眼,然后将雷管插入孔眼,并将脚线在药卷上套一个扣,并将剩余脚线全部缠绕在药卷上,同时将脚线末端扭结。
每个药卷内只准插入一个电雷管。
(5)装配好的引药要整齐摆放在炮药箱附近符合规定的安全地点,并且清点数量、掩盖好,不得丢失,不准随意地乱放。
4、装药前应做以下工作
5、(1)放炮员、班组长和瓦斯检查员对迎头附近20米范围内进行瓦斯检查,严格执行装药前及放炮后的“一炮三检”制度。(2)班组长负责对工作面附近洒水灭尘。
(3)班组长负责对迎头支架进行加固,保证支架完好。(4)用压风或掏勺将炮眼内的煤(岩)粉清理干净。(5)凡有下列情况之一的不准装药:
(1、)掘进迎头空顶距离超过作业规程规定,支架处于不完好状态。(2、)装药地点20米范围内,有未清除的煤、矸和矿车、机电设备或其他物体阻塞巷道端面1/3以上时(3、)装药地点20米范围内风流中沼气浓度达到1%和煤尘堆积飞扬时。
(4、)炮眼内发现异状、温度骤高骤底、炮眼出现塌陷、裂缝、有压力水、瓦斯突增等。
(5、)工作面风量不足或局扇停止运转时。(6、)炮眼内煤(岩)粉为清除干净时。
(7、)炮眼深度、角度、位置等不符合作业规程规定时。(8、)装药地点有片帮冒顶危险时。(9、)发现瞎炮、残炮未处理时。
6、装药
(1)放炮员必须按照爆破说明书进行装药。各炮眼的雷管段号要与爆破说明书规定的起爆顺序相符合。
(2)装药时要一手拉脚线,一手拿木制或竹制炮棍将药卷轻轻推入眼底,用力要均匀,使药卷紧密相接。装药完后要将两脚线末端扭结。(3)起爆方式分正向起爆和反向起爆。正向起爆的引药最后装,引药及所有药卷的聚能穴都朝向眼外。
(4)无论采用何种起爆方式,引药都应装在全部药卷的一端,不得将引药夹在两药卷中间。
(5)在有煤尘与瓦斯爆炸危险的掘进工作面严禁采用反向起爆的方式。
(6)在同一次装药放炮工作面,严禁装入两种不同性质的炸药。
7、封泥应用水炮泥以及不燃性的可塑性的材料制成。禁止使用块状材料或可燃性材料做封泥。未封泥或封泥不足和不严的炮眼禁放炮。
8、封泥的装填结构与操作应按如下规定:
(1)装填炮泥时,一手拉脚线,一手用炮棍轻轻推填炮泥,并捣实。(2)封泥装置结构是:先装填水炮泥一至数个,在水炮泥外端再填塞炮泥。
(3)装填水炮泥不要用力过大,以防压破。装填水炮泥外端的炮泥时,先将炮泥贴紧眼壁上,然后轻轻捣实。
9、炮眼封泥量的规定:
(1)炮眼深度小于0.6米时,不准装药放炮。
(2)炮眼深度0.6—1.0米时,封泥长度应不小于炮眼深度的1/2。(3)炮眼深度超过1.0米时,封泥长度不得小于0.5米。
(4)在有突出危险的掘进工作面中,所有不装药的炮眼都应用炮泥填实。
10、放炮母线的敷设:
(1)放炮母线必须使用导电性能好的绝缘双线,禁止用钢轨、金属管、电缆等导体当作回路或母线使用。
(2)放炮母线与电缆、信号线应分别悬挂在巷道两侧,如果必须挂在同一侧时,放炮母线必须挂在电缆等线的下方,并应保持0.3米以上的间距。
(3)放炮母线必须由里向外敷设。其两端头在与脚线、放炮器连接前必须扭结短路。
(4)放炮母线的敷设长度要符合作业规程有关规定。
711、连线方式与连线要求:
(1)各炮眼雷管脚线的连接方式应按作业规程要求,雷管脚线与母线的连接必须由放炮员操作。
(2)电雷管脚线和连接线、脚线与脚线之间的接头,都必须悬空,不得与任何物体接触。
12、在连线放炮前,必须在距迎头20米范围内进行第二次瓦斯检查。在瓦斯浓度不超限的情况下,方连线放炮。
13、放炮前要做好警戒工作:(!)班组长必须布置专人担任警戒。(2)警戒点要符合作业规程规定。
(3)各警戒点除警戒人员外,还要设置警示牌、栏杆或拉绳标志。(4)放炮前工作面所有人员必须撤至作业规程规定的最小安全距离以外的安全地点。
14、放炮:
(!)连线后,放炮员必须最后退出迎头,并沿途检查放炮母线是否符合要求。
(2)放炮员进入放炮地点后,随即发出第一次放炮信号。(3)放炮员接到组长的放炮命令后,将母线与放炮器相接,并将放炮把手插入放炮器,转至充电位置。
(4)第二次发出放炮信号。再走10—15秒,放炮器指示灯亮稳定后,将放炮器手把转回放电位置,将电雷管起爆,、,(5)起爆后,将母线从放炮器接线柱上摘下,并扭结短路,拔下的放炮器手把有放炮员随身携带,不得转交他人。
15、放炮后验炮:
(1)迎头排除烟后,班组长、放炮员、瓦检员立即进入迎头,由外向里顺序检查巷道支护情况,发现问题应及时处理。(2)检查瓦斯浓度,符合规定时方可开动电气设备。(3)检查工作面爆破情况,并找除悬矸危岩。
(4)通电后若未起爆,放炮员必须取下放炮手把,将母线摘下扭结短路。至15分钟后,方可沿线检查,若为短路、短线、连线不良等原因,应立即处理:若确认非线路原因,且不能确定瞎炮位置时,可采用分段连接,重新起爆,逐段排除。
(5)检查处理瞎炮或重新连炮前,必须设专人观察顶、帮情况,在确认安全前提下,方可进行操作处理。
16、处理瞎炮
(1)处理瞎炮时,必须在距瞎炮眼0.3米处,重新平行打眼装药放炮,新炮眼深度要超过瞎炮孔深度:打眼时应在瞎炮眼外端口插入炮棍作为导向标志。
(2)严禁用镐刨、手拉或压风吹的方法处理瞎炮:严禁将炮眼残底继续打深,用打眼的方法向外掏药。
(3)在处理瞎炮前,严禁在该地点进行与处理瞎炮无关的工作。(4)处理瞎炮之后,放炮员必须详细检查炸落的饿煤矸,找出未爆药包和雷管。
17、放炮结束后,放炮员要报告班长,由班长解除警戒后,其他人员方可进入工作面作业。
18、装药的炮眼必须当班放完,遇有特殊情况时,放炮员必须在现场向下一班放炮员交代清楚。
19、放炮后,应将放炮母线、放炮器等收拾整理好。
20、清点剩余雷管、炸药,填好消耗单,在核清领取数量与使用剩余的数量相符后,经班长签字,将当班剩余材料交回药库销号。严禁私藏爆破器材。
21、升井后,将放炮器、瓦斯报警器等交回规定的存放处。
采煤工作面放炮员操作规程
1、采煤工作面放炮员必须由责任心强、熟悉通风、瓦斯和爆破材料及放炮技术、经培训、考试合格,持有放炮员合格证专职人员担任。
2、严格遵守《煤矿安全规程》有关通风、瓦斯、火药管理等规定,切实执行工作面作业规程及爆破说明书和本操作规程。
3、严格执行“一炮三检”和“三人连锁换牌”放炮制度,工作面放炮前,放炮员、班组长、瓦斯检查员和兼职安监员都应该在现场。
4、在高瓦斯或具有煤尘爆炸危险的煤层中放炮时,必须采用正向爆破,严禁采用反向爆破。
5、严禁采用糊跑、明火、普通导爆索或非电导爆管放炮。
6、放炮与回采其他工序平行作业时,必须按照放炮的安全距离规定执行,否则应停止放炮。
7、在地质变化地带、冒顶区安全出口等处的顶板破碎、煤层松软、容易冒顶片帮的地段,要少装药、放小炮或不放炮。
8、运送炸药、装药封泥由兼职的放炮员助手进行。
9、炸药的存放:
(1)炸药在工作面临时存放,必须放置在距工作面煤壁30米以外顶板完好、支架完整、远离电器设备、不潮湿的安全地点。(2)炸药箱内只准存放炸药并上锁,严禁存放其他物品。(3)不准任何人在存放炸药的地点休息。(4)放炮器必须由放炮员随身携带。
10、放炮员的工作程序
准备(领取工具和爆破材料
运送爆破材料
存放爆破材料
装配引药)检查处理
放炮操作(装药
设警戒
连线
放炮
炮后检查
撤警戒)收尾工作。
11与区队联系确定当班使用雷管数量,填写领取单。严禁携带不合格的瓦斯检定器下井。
12、领取并检查防爆放炮器。
(1)用放炮器钥匙扭到充电位置,氖灯要发亮。(2)严禁用短路的方法检查放炮器。
(1)用放炮器钥匙扭到充电位置,氖灯要发亮。(2)严禁用短路的方法检查放炮器。(3)放炮器完好,电池有电。
13、领取放炮母线。
(!)必须使用橡胶铜芯或聚氯乙烯铜芯双线电缆。(2)放炮母线接头除锈、扭结并用绝缘带包好。
14、领取掏勺、木扦、木或竹质炮辊,炮辊的直径应略大于药卷的直径。
15、领送电雷管。
(1)只准领取毫秒延期电雷管,毫秒雷管最后一段的延期时间不得超过130秒。
(2)当面点清电雷管数量。
(3)严禁使用延期性电雷管、非电导爆管。(4)电雷管必须由放炮员亲自携带,不得乘车。(5)领到雷管后,应直接运到工作地点,严禁中途逗留。
16、装配引药
(1)只准有放炮员装配引药,不得由其他人代替。
(2)必须在顶板完好、支架完整、远离电气设备和导电体的巷道内装配引药。
(3)严禁坐在炸药箱上装配引药。
(4)从成束雷管中抽出单个电雷管时,应将成束的电雷管脚线顺好,拉出前端脚线将电雷管拉出,不得手拉脚线硬拽脚线,一个管线只准装一个管体。
(5)装配引药,用木扦或竹扦在药卷端头扎好大于雷管。(4)警戒的安全距离应超过放炮位置20米。
21、检查及处理:在连线和放炮前,放炮员和班组长、瓦斯检查员对放炮的地点进行第二次检查,对查出的问题应及时处理。有下列情况之一时,不准备进行连线放炮。
(1)放炮地点20米以内风流中瓦斯浓度达到1%;(2)存在第十七条的各项问题未处理或处理后又出现时;(3)没按第二十条的规定设好警戒;(4)放炮母线不足50米;
(5)应掩盖维护好的设施未进行掩盖和维护;(6)分段放炮时,崩倒的支架未扶好。
22、连线:
(1)要按照作业规程规定的放炮顺序和连线方法连线放炮;(2)严格执行谁连线谁放炮,即放炮母线连电雷管脚线、检查线路及充电都必须由放炮员本人操作。
(3)工作面布置的单排、双排、三花或五眼的连线都采用大串联法,最后剩下的两条脚线在未和母线连接前扭结成短路; 母线未和脚线前,两端必须扭结成短路。
(4)母线与脚线连接后,再沿线检查母线,放炮员最后退出放炮地点。
23、放炮:
(1)母线与电雷管脚线连接后,放炮员既吹第一次口哨并大叫喊“要放炮啦”;
(2)放炮员沿路检查线路,第二次吹口哨并大声叫喊“快放炮啦”;(3)放炮员到达放炮的警戒地点后,将母线连接在放炮器的接线端拧紧,这时第三次吹口哨并大声叫喊“放炮啦”,等待30秒确认无人后,用钥匙将开并转到充电位置,待氖灯闪亮稳定,将开关钥匙转到原来放电位置启爆。
(4)炮响后,首先取下放炮器钥匙,然后将母线从放炮器上摘下并打结短路。
24、炮后检查:
(1)放炮员会同班组长、瓦斯检查员进行放炮后的检查工作,检查及处理内容同第十七、二十一条;
(2)通电后若没有爆炸。至少15分钟后,放炮员方可沿线路检查不炸的原因;
(3)确属因连接不良造成不炸时,可以重新连接放炮;(4)若确属瞎炮,应按《煤矿安全规程》第315条处理。
25、装药的炮眼必须当班放炮完毕。若遇特殊情况无法当班放完时,必须在现场向下班放炮员交清情况。
26、在本班放完炮、吹散炮烟并经组长同意后,放炮员须吹长哨叫喊“放完炮啦”,由班长亲自撤警戒后才能让其他人员进入工作面作业。
27、收拾整理好工具,存放规定地点或亲自携带收藏。
28、点清剩余电雷管、炸药、填写消耗单并须经班组长签字。当班要办好爆破材料退还手续,不准私藏电雷管及炸药。
29、向下班放炮员交班,介绍当班工作情况。
30、上井后要将瓦斯检定器交回通风区仪器、仪表班。
防尘工操作规程
1、下井前要先准备各种所用工具和一定数量尺寸的管子、三通、阀门、螺丝、垫片,准备入井。
2、上井、下井管子装车要固定好,且要按矿运管处的作业规程,持证上岗。
3、安设防尘管路时,主要巷道100米设一处三通、阀门,辅助巷道要每50米设一处三通、阀门、管子、接头、螺丝、垫片要放到位,螺丝要紧到位,防尘管路要安设吊挂平直、牢固,接头严密不漏水。
4、拆除防尘管路是,要把所有拆除的管子、三通、阀门、螺丝、垫片装车固定好,全部升井入库。
防火工操作规程
1、风门或封闭墙四周掏槽不少于200㎝,见硬帮硬底与煤岩接实。
2、砌墙时沙浆比例按1:3:5配制,泥墙时按1:2配制。
3、砖墙必须三跑一丁层层带灰,灰缝饱满,不重缝、无瞎缝,墙面平整。
4、墙面要泥平,四周要抹唇边,唇边不少于200㎝。
5、砌好墙后,前后5米要清理干净,验收合格后方可交,风门交于木工,封闭交于盲巷工。
测风员操作规则
1、每次下井前,应配备风表、记时器、皮尺、记录手册以及瓦斯机、温度计等。并对各种仪表进行完好检查,保证正常使用。
2、测风地点应选择较为规范的断面,巷道与支护完好规整,前后十米无障碍物,无拐弯。
3、量断面时,根据巷道的实际情况,选择正确度量方法,皮尺拉平拉紧,计算断面时不同支护形式的巷道应分别计算,不准估计。
4、根据风速的大小,选择测量范围相适应的风表。
5、测风时仪表的指针是否在零位,不在零位时应进行回零。
6、测风时移动应均匀,路线正确,风速应与风流方向垂直,测量结束时,应同时按下封表和秒表,既可读出数据。
7、倾斜巷道测风时,应注意测风角度。
8、测风时,注意风流方向,严禁风表出现倒转。
9、计算风量时,应进行风速矫正,方可进行风量计算。
10、每地点测风时,应不少于三次,取平均值。
木工操作规程
1、按分工范围认真巡回检查井下的风门临时木板封闭,发现有所损坏应向单位领导汇报并及时维修,2、风门的制作要符合标准,门扇要平整不漏风,要错位接缝,门扇厚度不得小于30㎜,还应根据需要能做出不同规格的特制门。
3、风门安装后,门框要“包边沿口”,有衬垫,四周接触严密,通车风门必须上闭锁绳,松紧程度以两道门不能同时打开为标准。
4、风门水沟要设挡风帘,管线预留孔要用黄泥堵实,风门5米之内无杂物。
5、临时木板封闭,应设在顶帮良好处,密闭四周要接触严密,木版排列要采用鱼鳞式搭接,强面要用黄泥勾缝,严密不漏风。
6、地面木工房要严禁烟火,保持干净整齐,木工房内的电器设备要严格按照规定使用。
注水工操作规程
1、施工前必须对所施工采区进行考查,制度注水方案,并对钻机进行一次调试,配齐相关设备方可入井。
2、安装钻机设备时,必须和有关单位联系,写出停电申请,方可停电安装通电。
3、在采区1号孔位固定钻机的位置,根据本采区1号孔为煤层布置情况,调整钻机角度(平行煤层布置最佳),孔深度应为工作面长度的三分之二,孔径50mm左右。
4、施工中,钻机必须有专人负责开机、停机,并有专人负责监督工作情况,发现问题及时调整。
5、钻孔达到规定深度后,立即退取钻杆,进行封孔。
6、封孔时,先下入封孔设备,在用黄泥、水泥进行风堵,风堵长度不低于2m.7、在对2号孔施工时,1、2号孔间距应为25`-30m之间,其它孔位依次类推。
8、在对煤体注水时,可根据煤体结构而定,可采用动压,静压两种方式注水。
9、安装流量表测定注水的大小。
测尘工操作规程
1、给仪器充好电,并检查测尘仪器的流量计、定时器和气泵气密性是否正常。
2、调整好天平,准备称重。
3、将准备好滤纸集尘进行称重,并记录好编号和称重后的数据。
4、带仪器到井下各计划点将滤集尘装机进行实测,并记录好所测的地点、工序、时间、流量。
5、测后将所测过的滤纸集尘带到地面,先干燥,后称重,并记录好所测(滤纸、集尘)的编号、数据。
6、然后把所测(前、后)滤纸集尘的数据代入公式,计算出所测地点的粉尘浓度。
7、做好报表报集团公司、矿。
微机工操作规程
1、开机顺序:先打UPS约一分钟后,打开主机终端及终端显示屏;再打开打印机、图形显示器。
2、关机程序:(1)在主屏键入CTRL+K退出矿用软件,在SHPER—提示下键入EXIT+回车,退出系统管理,再按下中断按钮;(2)先关打印机→图形显示器→终端显示屏→终端→主机→UPS→电源。
3、正常运行期间,不得擅自退出矿用系统,不得擅自关机。
4、机器发出的报警应及时查明原因,详细记录,不得擅自废除机内原始文件。
5、(1)当供电电源出现故障时,立即向值班人员汇报,在UPS工作时间内处理不好时,则按顺序关机;(3)系统死机时可按下复位按钮,重新引导系统回到矿用软件管理系统;(4)系统发生故障而暂时处理不好时,必须汇报并启动备用系统,以上问题应做详细记录。
拆除安装工操作规程
1、安装时,要按图纸要求将所用的风筒及线路等,一切设备在地面实验、验收合格后,方可下井。
2、按说明书要求把设备安装到位,一切运行正常后,方可通过验收移交使用人或单位并有记录。
3、回收时:(1)风筒要按数量按时回收到位,入库时,要经库房人员验收并有记录;(2)回收线路等设备时,要按规定与相关单位联系好,并按质按量回收到位,入库时,要经库房人员验收并有记录。
4、所安装的风筒及线路要严格按规定要求做好一切工作,风筒要两靠一直,线路每米一个吊挂点,设备要完好,位置要正确。
盲巷管理工操作规程
1、盲巷的管理人员按照区队安排带运栅拦材料及有关工具到所需要地点进行按标准打栅拦,清理封闭墙外和栅拦内外附近杂物。
2、每周巡回检查分管范围内的盲巷、封闭。
3、检查内容巷道封闭墙体、内外气体、压差、温度,并记录工作手册,填写检查记录和管理台帐。
4、检查结果及时向区队汇报。
瓦检工操作规程
1、下井前要对本仪器进行检查各部件和药品性能是否完好,要在工作场所范围内的新鲜风流对本仪器。
2、班中负责检查所有被检查的场所瓦斯浓度和温度,采掘工作面要检查巷道风流中瓦斯浓度,发现问题要请示回报处理。
3、检查后要填写瓦斯记录牌板和瓦检员工作手册,进行回报。
4、当班人员要备用风筒和负责续接整理掘进工作面前端3节风筒和班中回报。
5、现场瓦检员对掘进工作面停电停风地点要及时撤出巷道内作业人员,并设置栅栏和警标,向矿、区调度回报。
6、严格执行现场交接班制度和交换本班存在问题并签字,班后要交清瓦斯机和检查记录手册。
光学甲烷测定仪校验操作规程
1、发放前要检查仪器是否完好,杜绝损坏的一起带下井。
2、及时清除一起表面的污物、灰尘。等由气路和缝隙进入一起。
3、检修时不得擅自更换不同型号的配件,必须与型号规格、参数及结构保持一致,以保证仪器的稳定性。
4、本仪器使用时要按规定时间校验或修理后,必须进行校正,使仪器的误差在规定的范围内,既:
测量范围(CH4)
允许误差(CH4)
0~1
±0.05
>1~4
±0.1
>4~7
±0.2
>7~10
±0.35、仪器必须装在皮套内,否则严禁入进井使用。
监测工操作规程
1、定期对各风站的电源箱防爆面进行完好处理。
2、要定期对各短电装置的防爆面进行完好处理。
3、要定期对瓦斯传感器进行调校。
4、调校瓦斯传感器应遵守先通空气后瓦斯的原则。
5、通气调校传感器时,一定要用流量计控制流量。
便携仪校验操作规程
1、校验仪器要轻拿轻放。
2、校验前要开机预热20分钟,然后看零点指示情况,若有偏差,调回零点。
3、零点稳定后,通入标准气样,看其显示值是否与标准气样相符,若不符,调其满度电位器,使其显示与标准气样符合。
4、校验的同时看仪器的报警点是否在1%时报警,若不报警,调其报警点电位器,使其在1%时报警。
5、以上工作完成后,仪器要及时上架充电。
木工操作规程
1、及时从料厂领取木板,木板厚度为6cm,宽150cm,长4m.2、制作时要先把木板按尺寸截好、刨平再开槽,大门的尺寸为1.36*1.65米,小门为0.6*1.2m.3、下门时要把门装在特制的车内,用铁丝捆牢防止松动。
4、井下须用绞车,要保持换牌才能操作。
5、安装时要检查防火砌的风门是否合格,不合格的风门严禁安装。
6、安装要先上门轴,门轴安装好后在当风门挂好后要检查风门是否自动,如果风门完好,再把包边沿口钉好。
7、要每周把自己所辖区域内的风门检查一次,发现问题要及时汇报处理。
8、风门水沟要设置挡风帘,管线孔要用黄泥封实,清除风门5米内的杂物。
打钻工操作规程
1、钻机施工前,在地面接通电源,测试电机的灵敏度,调试合格后装车准备入井。
2、根据施工地点的实际情况,领取与其相符的电缆和电器设备,装车准备入井。
3、配齐施工所需各类工具。
4、钻机施工上下移动时,必须根据绞车管理制度友专人持证操作。
5、施工前钻机固定时,先选好孔位,垫好枕木,用升降器把钻机吊起,固定在枕木上,调好方向,打上压力柱,使钻机不至移动为止。
6、钻机位置固定好后,把钻杆角度调整到与煤层走向平行后,准备开机。
7、安装钻头、钻杆连接好水源后,紧好钻杆顶丝后,由专人负责开机、停机。
8、钻杆达到一定深度,拆降水源连接器,松动顶丝推出钻杆,堆放整齐。
9、封孔时把封孔器放入钻孔,先用黄泥封堵,再用水泥封孔,封孔长度不小于2米。
2210、注水时,把封孔器连接到水量计量器上,再连接到固定的水源上,进行注水,注水量达到煤层所需时停止注水。
11、施工完毕后,把钻机设备、施工工具装车后打上井,入库备用。
防尘工操作规程
1、防尘工要做好井下各产尘点的防灭尘工作。
2、大巷要每5天,皮带巷要每3天冲刷或清扫一次,工作面要每班冲刷或清扫一次,必须冲刷井巷四周。
3、下井前先准备好所有工具和一定数量尺寸的管子、三通、阀门、螺丝、垫片等一并入井。
4、上下井管子装车固定好,且要按矿运管处的作业规程,持证上岗。
5、安设防尘管路时,主要运输巷道要每100米处设置三通、阀门,辅助巷道每50米设置一处三通、阀门、管子接头螺丝、垫片要齐全且垫片要放到位,防尘管路要吊挂平直、牢固,接头要严密不漏水。
6、拆除防尘管路时,要把所有拆除的管子、螺丝、垫片、三通等装车固定好,全部升井入库。
防火工操作规程
1、下井前根据提供的巷道断面备料。
2、联系矿车,把备料运输到设置门、墙的地点。
3、遇到绞车时要持证、换牌方可操作,开车前要检查绞车和大绳是否完好,不完好的绞车不准操作。
4、门墙的厚度一律为0.5米。
5、砌墙时要掏槽,见硬底硬帮,砖要一跑三丁,层层带灰,与煤岩接牢,灰浆要饱满无重缝、瞎缝、空缝。砌墙沙灰比例3:1,泥墙沙灰比例为2:1。
6、三空要齐全。
7、墙砌好后要泥单,检查合格后把门墙前后5米清理干净,方可离开。
井下瓦斯抽放泵工操作规程
一、准备工作
瓦斯抽放泵超动前,必须首先检查供电,供水系统是否正常可靠,只有当两者可靠时,方可起动。
二、起动
1、检查电机与泵轴的同轴度。
2、用手转动联轴器,看转子转动是否灵活,有无卡住或磨擦现象。
3、检查各部分螺栓是否有松动现象。
4、检查轴泵的润滑脂是充足。
5、从进水管注入水、冲洗五分钟,同时用手转动转子,然后放出污水。
6、向泵腔内和填料处注入压力约为78-147Kpa的清水,注水时间约为30秒。
7、检查填料的松紧度,以密封水成滴滴下为宜。
8、打开进所阀门,开启开关,试验起动(约1分钟)检查电机的转向与水环泵的转向是否一致,如一致可起动运转。
三、运转
241、在正常启动后,在规定转速下,在工作范围人进行运转试验,时间不少于30分钟,试运转时检查轴封和联接部位的密封性,一切正常后,方可投入工作运转。
2、在泵运转中,应连续不断地向泵腔和填料处供水。
3、泵运转中应随时检查泵运转声音是否正常,泵是否振动。
四、停车
1、关闭进气管路上的阀门。
2、关闭电动机。
3、关闭各供水管路阀门。
4、打开放水管或泵体上的丝堵将水放掉。
5、长时间停车应关半监测系统,短期停车,可不停止监测系统工作。
五、两台泵互换运转
1、备用泵空载运转正常后,调小运转泵的流量。
2、开启备用泵与运转泵系统间的联络阀,并关闭备用泵的配风门,使备用泵低负荷与运转泵并联运转。
3、当备用泵带负荷运转正常后,停止原抽放泵运转,并开、关有关阀门,调整备用泵的流量。
通风队各工种操作规程一、瓦斯检查工:1.瓦斯检查员负责检查所管辖范围内的瓦斯浓度、温度及“一通三防”设施的运行情况。2.必须熟悉矿井通风系统和所管辖范围内的通风、瓦斯、......
瓦斯检查工操作规程1、入井前对仪器进行漏气、光亮、条纹等方面的全面检查,药品按时更换,换气要在与检查地点温度差不超过1O℃的新鲜风流中进行,确保仪器完好、测数准确。2、检......
通风队各工种操作规程瓦斯检查员操作规程一、入井前对瓦检仪进行检查1、首先要对瓦检仪的外观进行检查,对瓦检仪的目镜盖、主调螺旋盖、皮套、背带、胶管、吸气球和水分吸收......
通风设施工安全操作规程通风设施工负责矿井上下各种通风设施(风门、密团、风桥)的施工和维护。为确保矿井通风系统的完好,设施工必须严格执行设施质量标准;为确保施工安全;必须......
通风各工种岗位责任制一、通风科岗位责任制通风科长、副科长及其工作范围对矿总工程师负责1、在矿总工程师的领导下全面负责本科工作安排和人员分配工作。2、按时向各级领导......